Serving a schedule of dilapidations: a guide for commercial landlords

Nadine-Williams-Solicitor
Nadine Williams
Solicitor
23 Nov 2026
— Blog
Before serving a schedule of dilapidations, commercial landlords should check the lease, record the property’s condition, and establish whether a separate reinstatement notice is needed. Timing and the contents of the schedule can affect any claim.
Empty office requiring repairs at the end of a commercial lease

Throughout the duration of a commercial lease, and in particular when a commercial lease is coming to an end, a landlord will need to consider whether the tenant has met their obligations to repair, redecorate, and reinstate the property.

A schedule of dilapidations sets out the breaches the landlord believes have occurred and the work needed to put them right. Preparing it carefully, and considering the timing of any separate notices, can make a significant difference to the landlord’s position.

If your commercial tenant has failed to comply with their repairing covenants or your lease is approaching its end, contact our property litigation solicitors for advice on the lease, any notices required, and your options for a dilapidations claim.

What is a schedule of dilapidations?

A schedule of dilapidations is a document setting out the landlord’s assessment of the tenant’s breaches of obligations relating to the condition of a commercial property.

Depending on the lease and the circumstances, it may identify outstanding:

  • Repairs to the property.
  • Redecoration work.
  • Reinstatement of alterations made by the tenant.
  • Other work required under the lease.

The schedule should identify the relevant lease obligations, explain the alleged breaches, and set out the work considered necessary to remedy them. It may also include the landlord’s assessment of the cost of that work.

A schedule is normally prepared by a building surveyor with experience in dilapidations. A solicitor can advise on the lease terms, notices, and the legal basis of any claim.

When should a landlord serve a schedule of dilapidations?

Subject to the terms of your lease, a schedule of dilapidations can be sent to the tenant at any time throughout the duration of the lease and shortly after termination.

An interim schedule of dilapidations is served on the tenant during the term of the lease.

This gives the tenant an opportunity to understand the alleged breaches and carry out work while they still occupy the property. Furthermore, earlier notification of remedial works required throughout the lease assists with preventing continued disrepair at the property, which can be costly.

A terminal or final schedule of dilapidations is sent on or after the termination of the lease.  

Where a schedule is sent before the end of the lease, and the landlord intends to pursue a terminal dilapidations claim, the landlord should either confirm at termination that the schedule remains accurate or send a further schedule within a reasonable time.

For a claim relating to the condition of commercial property at the end of a tenancy in England and Wales, the Dilapidations Protocol says that a schedule should generally be sent within 56 days after the tenancy ends. What is reasonable will depend on the circumstances. The 56-day period is a general protocol timeframe, rather than an automatic deadline after which a claim is lost.

It is sensible to take advice well before the lease expires and at any point throughout the lease where the landlord suspects that a tenant has breached their repairing covenants. The lease may require other notices to be served within a set timeframe, and waiting until the tenant has left could limit your options.

What should the schedule include?

The schedule should be based on the lease and the condition of the property. It should normally identify:

  • The relevant clauses in the lease and other documents.
  • Each alleged breach of the tenant’s obligations.
  • The work proposed to remedy each breach.
  • Any relevant reinstatement notices served.
  • The estimated cost of the work, where appropriate.

The alleged breaches should be separated into categories, such as repair, redecoration, and reinstatement. The schedule should be clear enough for the tenant and their advisers to understand and respond to each item.

For a terminal claim covered by the Dilapidations Protocol, the schedule should also be endorsed by the landlord or the surveyor who prepared it. The endorsement addresses whether the work and any costings are reasonable, and whether the landlord’s intentions for the property have been taken into account.

Why do the landlord’s plans for the property matter?

Your surveyor will need to understand what you intend to do with the property after the lease ends. For example, you may plan to refurbish, redevelop, or re-let it.

Those plans can affect the work reasonably required and the loss arising from the tenant’s alleged breaches. If you intend to remove part of the property as part of a redevelopment, work to that same area may no longer be needed.

Give your surveyor a clear account of your intentions when they prepare the schedule, and keep them informed if your plans change.

Record the property’s condition

If the tenant has not completed the required work before leaving, arrange for your surveyor to inspect the property as soon as practicable after the lease ends.

A prompt inspection can help record the condition in which the property was returned. If there is a long delay, or work takes place before the condition is documented, it may be harder to establish which issues existed at the end of the tenancy.

Check whether a separate reinstatement notice is needed

A tenant may have altered the property during the lease, perhaps by installing partitions, changing the layout, or adding equipment. Whether the tenant must remove those alterations will depend on the lease, any licence for alterations, and the wording of the relevant provisions.

Some documents require the landlord to serve a notice if they want alterations reinstated. The notice may need to be served before the lease ends and in a particular way.

A schedule of dilapidations should not automatically be treated as a substitute for a separate reinstatement notice. The documents need to be checked early so that any required notice can be prepared and served correctly.

How should the schedule be sent?

The lease and any related documents should be checked for provisions that may apply to notices, including where, how, and on whom they must be served.

The Dilapidations Protocol says that schedules should be sent electronically wherever possible so that the tenant’s comments can be incorporated into the same document. However, this does not remove the need to comply with any applicable requirements for a separate contractual notice.

Keep a record of what was sent, when it was sent, and how it was delivered. If there is any uncertainty about the correct recipient or method of service, take advice before sending the documents.

Is a schedule of dilapidations the same as a quantified demand?

No. A schedule of dilapidations identifies the alleged breaches and the work needed to remedy them. A quantified demand sets out and supports the financial sum the landlord is seeking, including any other losses claimed.

The cost of the work in a schedule is not necessarily the amount a landlord can recover. For example, the landlord’s plans to redevelop or alter the property may affect the loss arising from the tenant’s alleged breaches.

A quantified demand should reflect the landlord’s likely loss and explain the basis of the sum sought. A surveyor and solicitor can help assess how the schedule and demand should be prepared.

Is it the same as a schedule of condition?

No. A schedule of condition records the condition of a property at a particular time, often at the start of a lease. It may be attached to the lease and, depending on the wording, limit the tenant’s repairing obligations.

A schedule of dilapidations identifies alleged breaches of those obligations. If a schedule of condition exists, it should be provided to the surveyor so they can consider it alongside the lease.

Common mistakes landlords should avoid

A dilapidations claim can be weakened by decisions made before the schedule is sent.

Common mistakes include:

  • Leaving the review too late. A reinstatement notice or other step may be required before the lease ends.
     
  • Failing to check all relevant documents. The lease, licences for alterations, and any schedule of condition may affect the tenant’s obligations.
     
  • Assuming every item of disrepair is the tenant’s responsibility. The scope of the repairing obligation depends on the lease wording and the circumstances.
     
  • Overlooking plans for the property. Proposed redevelopment or refurbishment may affect the work that is reasonably required and the landlord’s recoverable loss.
     
  • Confusing the cost of work with the claim value. The estimated cost of repairs is not automatically the sum the landlord can recover.
     
  • Missing a separate notice requirement. A schedule does not necessarily satisfy a requirement to serve a reinstatement notice.
     
  • Delaying the inspection. The condition of the property may be harder to establish if it is not recorded promptly after the lease ends.

What happens after the schedule is sent?

The tenant and their advisers will have an opportunity to consider and respond to the alleged breaches and any financial demand. They may agree some items and dispute others, including the work proposed or the amount claimed.

The parties’ surveyors may then seek to narrow the issues and negotiate a settlement. If the dispute cannot be resolved, further legal action may be considered.

Advice on serving a schedule of dilapidations

If a commercial lease is approaching its end or a landlord suspects that a tenant has breached their repair covenants throughout the lease, our property litigation solicitors can review the lease and advise on the steps needed to protect your position.

Nadine Williams, a solicitor in our property litigation team, says:

“Failing to ensure that the property remains in good repair can be extremely costly for a landlord, especially when a lease is coming to an end. Reviewing the lease to understand the repair covenants and ensuring the tenant complies with their repairing covenants throughout the tenancy is one means by which a landlord can mitigate any losses suffered from prolonged disrepair. It is important to understand the lease and any notice requirements before the tenant leaves, as this gives landlords time to establish what work is required and whether a separate reinstatement notice is needed. We can work alongside your surveyor to help you prepare a clear, well-supported claim.”

Contact us with a copy of the lease, the expiry date, any licences for alterations, and any existing schedule or notices. We can work alongside your surveyor to help you prepare the claim and identify any notices that need to be served.